Construction covered by the Party Wall Act of 1996
Contents |
[edit] Introduction
When discussing works that fall within the remit of the Party Wall Act of 1996, it is important to understand and differentiate between works that are ‘notifiable’ and works that are not covered within the Act, also known as “non-notifiable” works.
The term notifiable referrers to works that may be taking place within a homeowner’s property (or building owner under the Party Wall Act 1996). If the proposed works affect any of the neighbouring properties (known as the adjoining owner’s property), then Party Wall procedures will apply.
Notifiable works usually fall within different categories and are notifiable under different Sections of the Act. Notifiable works usually include:
- Excavations taking place near an adjoining owner’s property (such as walls, outhouses or garden structures).
- Works taking place which directly affect a party structure or party wall.
- New walls being built up to - or astride - the line of junction (or boundary line) between two or more properties.
[edit] Excavations
Excavation works taking place within a building owner’s land may still be notifiable, since it may pose a risk to the foundations beneath those structures. This often comes into play with rear extensions or basement conversions.
The sections of the Party Wall Act of 1996 that would apply are:
- 6(1) Excavate to accommodate the foundations to a proposed extension within three metres.
- 6(2) Excavate to accommodate the foundations to a proposed extension within six metres where it cuts at a 45 degree angle measured from the adjoining owner’s footing
[edit] Works directly affecting party wall or structure
Works that directly affect a party structure or party wall have a two month notice period. These types of works most commonly tend occur when undertaking loft conversions, removing chimney breasts or undergoing other structural works to the party wall.
Under the Act, the different types of work covered are set out within the sections below:
- 2(2)(a) To underpin, thicken or raise a party structure, a party fence wall, or an external wall which belongs to the building owner and is built against a party structure or party fence wall.
- 2(2)(b) To make good, repair, or demolish and rebuild, a party structure or party fence wall in a case where such work is necessary on account of defect or want of repair of the structure or wall.
- 2(2)(f) To cut into the party wall for the insertion of steel beams facilitating a proposed loft conversion in the process exposing the party wall.
- 2(2)(g) To cut away the chimney breast(s) attached to the party wall.
- 2(2)(h) To cut away parts of any wall or building of an adjoining owner overhanging onto the land of the building owner.
- 2(2)(j) To cut into the wall of an adjoining owner’s building in order to insert a flashing or other weather-proofing.
- 2(2)(k) To execute any other necessary works incidental to the connection of a party structure.
- 2(2)(l) To demolish party fence wall and rebuild as a party wall.
- 2(2)(n) To expose the party wall.
[edit] New walls
In order to build a new wall up to - or astride - the boundary line, a building owner must get consent beforehand. If the building owner does not get consent, then the new wall must be built within the building owner’s boundary and therefore be built up to the line of junction. These types of works are most commonly the flank walls of new rear, side or front extensions.
The section that would apply to this would be:
- 1(2) Build a new party wall astride the line of junction, forming the flank wall of the proposed extension.
- 1(5) Build a new wall up to the line of junction, but wholly on the building owner’s land forming the flank wall of the proposed extension.
This article was provided by Berrylodge in April 2020.
[edit] Related articles on Designing Buildings
Featured articles and news
Preparing safety case reports for HRBs under the BSA
A new practical guide to preparing structural inputs for safety cases and safety case reports published by IStructE.
Male construction workers and prostate cancer
CIOB and Prostate Cancer UK encourage awareness of prostate cancer risks, and what to do about it.
The changed R&D tax landscape for Architects
Specialist gives a recap on tax changes for Research and Development, via the ACA newsletter.
Structured product data as a competitive advantage
NBS explain why accessible product data that works across digital systems is key.
Welsh retrofit workforce assessment
Welsh Government report confirms Wales faces major electrical skills shortage, warns ECA.
A now architectural practice looks back at its concept project for a sustainable oceanic settlement 25 years on.
Copyright and Artificial Intelligence
Government report and back track on copyright opt out for AI training but no clear preferred alternative as yet.
Embedding AI tools into architectural education
Beyond the render: LMU share how student led research is shaping the future of visualisation workflows.
Why document control still fails UK construction projects
A Chartered Quantity Surveyor explains what needs to change and how.
Inspiration for a new 2026 wave of Irish construction professionals.
New planning reforms and Warm Homes Bill
Take centre stage at UK Construction Week London.
A brief run down of changes intentions from April in an onwards.
Reslating an ancient water mill
A rare opportunity to record, study and repair early vernacular roofs.
CIOB Apprentice of the Year 2025/26
Construction apprentice from Lincoln Mia Owen wins this years title.
Insulation solutions with less waste for a circular economy
Rob Firman, Technical and Specification Manager, Polyfoam XPS explains.
Recycled waste plastic in construction
Hierarchy, prevention to disposal, plastic types and approaches.
UK Net Zero Carbon Buildings Standard V1 published
Free-to-access technical standard to enable robust proof of a decarbonising built environment.